Homes in England and Wales. Procedures and enforcement depend on location, dates and the work involved.

Planning permission or building regulations: which is missing?

“The paperwork for the extension” could mean several different things. Planning permission concerns whether development is permitted. Building regulations concern matters such as structure, fire safety and energy performance. A builder’s invoice, warranty or engineer’s calculation has a different purpose again.

A completion certificate is evidence of building control sign-off. An approval at the beginning of a project is not necessarily evidence that the completed work was signed off at the end. For certain work, a registered competent person can self-certify compliance, so the relevant document may come from a scheme rather than the route used for a full extension.

Start by asking your conveyancer what evidence the buyer’s side has requested and for which work. “A 2016 loft conversion completion certificate” gives you something to search for. “All certificates” can lead to days spent finding documents that do not answer the enquiry.

Lost certificate, missing sign-off or no approval?

Do not choose a solution until you know which of these situations describes the property. The buyer’s lender and conveyancer may need more evidence even after a document is found; no row in this table guarantees acceptance.

What you know
You remember a final inspection and certificate.
What may be missing
A copy of an existing document.
First step
Check your purchase file and previous correspondence; agree a records search with your conveyancer.
What you know
An application or approval exists, but you cannot establish final sign-off.
What may be missing
Evidence that the approved work was completed and inspected.
First step
Ask your conveyancer to identify the approval route and what final evidence is needed.
What you know
You cannot establish that approval was obtained where it was required.
What may be missing
The approval itself, not merely a lost certificate.
First step
Get advice on the available routes before approaching authorities or buying insurance.

Build a small evidence pack

Make a list of the alterations, approximate dates and who carried them out. Separate work you commissioned from work already present when you bought. State what you actually know; do not turn a previous owner’s comment into a fact you cannot verify.

Look through the report and documents from your own purchase, solicitor correspondence, saved emails, invoices, drawings and guarantees. If you still have access to your previous conveyancer, ask whether their file contains the particular document. Records may not be retained indefinitely, so do not assume a copy will be available.

For replacement windows, heating or electrical work, note the installer and any competent person scheme mentioned on the paperwork. Your conveyancer can help distinguish the relevant compliance certificate from a service record or warranty. One is not automatically a substitute for another.

Keep a record of what you have already searched and whom you have contacted. Tell your conveyancer about previous contact with the council or building control. That history can matter when assessing possible legal or insurance options.

An illustrative loft-conversion enquiry

Imagine a seller bought a house with a loft conversion already in place. They have a planning decision, a builder’s invoice and a set of drawings, but no final building control certificate. This is an invented example, not a North West Conveyancing client case.

The seller should not tell the buyer that “it had planning, so it is all approved”. Instead, they send the documents and dates to their conveyancer and explain what they cannot find. The firm asks whether the original building control application can be identified and whether the enquiry is about a copy, final sign-off or work without approval.

If a certificate exists, obtaining a copy may resolve the document gap. If the work never received final sign-off, the next steps depend on the original route, available records and condition of the work. If no required approval was obtained, a different assessment is needed. Those situations can look identical in a drawer of old paperwork but are not the same problem.

The buyer also needs to consider physical condition. A legal response to an enquiry does not inspect hidden structural work. A surveyor or suitable specialist may need to advise, and the buyer’s lender can have its own requirements.

What retrospective approval can involve

Regularisation is a route for seeking retrospective building regulations approval for qualifying work carried out without the necessary consent. GOV.UK says this is available through a local authority building control body only, for work carried out after 11 November 1985. It is not a general certificate-buying service for every missing document.

An authority may need to inspect the work, ask for parts to be opened up or require alterations before a certificate can be issued. Application fees are not the only possible cost: exposing work, repairing finishes and correcting defects can also matter. Do not book a completion date on the assumption that an application will be approved quickly.

Where an application already existed but no completion certificate was issued, ask what route applies rather than assuming regularisation is appropriate. Cheshire East’s guidance, for example, distinguishes that situation from work that can be regularised. The location and history of your work need to be checked by the people advising on your case.

This note does not give a universal enforcement cut-off. England and Wales can differ, rules change, and the dates and type of work affect the answer. “It is old, so it cannot matter” is not a reliable substitute for advice.

Insurance is not a condition survey

A suitable indemnity policy may sometimes address a particular legal enforcement risk. It does not certify that the work is safe or compliant, and you should not assume it pays to repair defective construction. The actual policy wording, exclusions and lender requirements control what it covers.

Speak to your conveyancer before making a new approach to an authority or applying for retrospective approval if insurance is being considered. Prior contact can affect whether a policy is available. That is not advice to hide an issue, give an inaccurate answer or delay dealing with unsafe work: disclose the facts to your conveyancer and ask them to coordinate the next step.

A buyer may still want a specialist inspection even where an insurer will offer cover. The legal risk and the physical condition are different questions. If you know of a safety concern, raise it rather than treating an insurance premium as the solution.

The questions worth sending your conveyancer

A precise enquiry response is more useful than guessing which remedy the buyer will accept. Use these questions to agree a sequence before spending money.

  • Which work and exact document does the buyer’s enquiry concern?
  • Is this a missing copy, absent final sign-off or work without required approval?
  • What can we establish from my purchase file and the documents I already have?
  • Should you coordinate any contact with building control, an installer or a scheme?
  • What would the buyer’s lender need before the proposed route could be accepted?
  • Does physical condition need a separate surveyor or specialist assessment?
  • What costs and steps could the proposed route involve, without promising a completion date?

If you are preparing to sell rather than answering an enquiry

Collect the evidence before an offer brings a deadline. Complete the seller’s forms accurately and tell your conveyancer about the gap at the start. Having the conversation early gives more room to identify records and assess options; it does not guarantee that the issue will be inexpensive or resolved before a particular date.

You do not need to solve every legal question before obtaining a conveyancing quote. Describe the property and known alterations honestly, then ask about any additional work and charges before instructing. A standard online quote is not a review of the approval history.

If you already have a conveyancer and a live enquiry, send the evidence to that firm first. Starting another quote will not answer the buyer’s question. The useful next step is to establish the exact gap, the responsible person and the evidence needed to move forward.

Read next

Sale conveyancing